top of page
SWISSOTEL ANKARA
In the 5-star SWISSOTEL ANKARA Project, 40,000 m² of reinforced concrete construction was carried out by our company. In this project, our company used PERI Multiflex, Vario, Domino, Trio formworks as well as PERI PD8 scaffolding systems, SB2 single-sided curtain formwork system and DOKA Multiflex floor formwork systems.

SWISSOTEL ANKARA

SWISSOTEL ANKARA

SWISSOTEL ANKARA
1/2
bottom of page