top of page

SWISSOTEL ANKARA

In the 5-star SWISSOTEL ANKARA Project, 40,000 m² of reinforced concrete construction was carried out by our company. In this project, our company used PERI Multiflex, Vario, Domino, Trio formworks as well as PERI PD8 scaffolding systems, SB2 single-sided curtain formwork system and DOKA Multiflex floor formwork systems.

© 2017 Nova Construction Tourism Engineering Trade and Industry Ltd. Co.

  • Facebook - Grey Circle
  • LinkedIn - Grey Circle
  • Google+ - Grey Circle
bottom of page